Site Information Setup

Site Setup Form - Sections
  • GETTING STARTED
  • SITE DETAILS
  • CONTACT DETAILS
  • POOL DETAILS
    • COMPLETED BY
    GETTING STARTED

    Completing This Form

    This form can be completed using an iPhone, Android phone, desktop computer or laptop.

    For iPhone users: You can take photos and upload them directly while completing the form.

    For Android users: Before starting the form, you must first take all the required photos. Once you have captured the necessary images, you can complete the form and upload them from your phone's gallery. You can upload up to three photos for each item listed below.

    Required Photos

    Please take clear, landscape-orientated photos of the following:

    • Pool – Wide view
    • Plant room – Wide view
    • Chemical control equipment – Close-up
    • Primary sanitation equipment – Close-up
    • Secondary purification equipment (if applicable) – Close-up
    • Filtration equipment – Close-up
    • Water testing equipment – Close-up

    If your site has multiple pools or plant rooms, repeat this process for each Pool/Plant Room during the setup.

    As part of this setup, you will be required to:

    1.Nominate Users
    Provide details for up to five (5) authorised users who will have access to the HealthySwim reporting platform for this Site.

    2. Provide Equipment Details (Per Pool / Plant Room)
    For each body of water, you must provide details of the following systems in operation:
    • Dosing / chemical control equipment
    • Primary sanitation equipment
    • Secondary purification equipment (if applicable)
    • Filtration equipment
    • Water testing equipment
    This information ensures your Site is correctly classified for testing frequency, monitoring, reporting and compliance assessment.

    Upload Photos
    You will be required to upload clear photos during this setup, including:
    • Pool (wide view) (landscape)
    • Plant room (wide view) (landscape)
    • Chemical control equipment (close-up) (landscape)
    • Primary sanitation equipment (close-up) (landscape)
    • Secondary purification equipment (if applicable) (close-up) (landscape)
    • Filtration equipment (close-up) (landscape)
    • Water testing equipment (close-up) (landscape)
    Repeat this setup for each Pool / Plant Room at the Site.

    Estimated time: 20–30 minutes per body of water

    Need assistance? Call 1300 68 79 30

    Form completed by:

    Name
    Name
    First Name
    Last Name
    Are you completing this form as a new or existing member?
    Which site details would you like to update?

    Contact Us Today…

    Contact Us
    Your status

    Register Interest…

    Accreditation Interest

    Register Interest…

    Audits Interest

    Nominate a pool…

    Nominate

    Water Course Register Interest

    Water Course